August 6, 2025 News

8/5/25 1-105

8/5/25 Canal 1 Headgate 105 closed due to flooding. No eta at this time as to when back open.

August 4, 2025 News

8/7/2025 hg repair 1-73 downstream no water

8/7/25 Headgate repair on canal 1 no water from hg 73 down stream.  Water back on later today.

July 30, 2025 News

7/30/25 Sluicing operation 1-144 thru 1-179

7/30/25 Sluicing operation today on Canal 1, these headgates will not have water until late today 1-144 through 1-179. This will help get water to the end of the canal.  It is that time of year we are pinching headgates […]

July 9, 2025 News

7/9/25 low water hg 1-144-179

7/9/25 Low water end of canal 1.  Canal 1 headgates 144 -179 will be low due to sluicing operations moving silt and algae out of canal. Estimated water back to normal tonight around 4pm.

July 9, 2025 News

Water Loss Study 7/9/25

Water Loss Study Headgate Closures Reminders: 7/12/25 Water Loss Study headgate closures.  Approximately 5am to 4pm, Canal 1 headgates 1-29, Canal 2 headgates 1-49 will be closed. 7/13/25 Water Loss Study headgate closures. Approximately 5am to 4pm, Canal 1 headgates […]

June 30, 2025 News

6/30/25 MM-90 Repair

6/30/25 Mutual Mesa headgates 85 – 92 no water due to repair on hg MM-90 today. 6/30/25 repair complete water being put back in 3:15pm.

June 26, 2025 News

6/26/2025 Canal 1 headgates 122-145

6/26/25 Canal 1 headgates 122 – 145 are shut off due to sluicing operations to move algae and silt out of the canal.  The hg will be opened back open later today.  Water will be back to normal this evening.

June 3, 2025 News

6/3/25 Water Loss Assessment

Upcoming District Water Loss Assessment – July 12–16, 2025 Orchard Mesa Irrigation District (OMID), in partnership with Farmers Conservation Alliance (FCA), will be conducting a water loss assessment in selected segments of Canal 1 and Canal 2 from July 12-16, […]

May 8, 2025 News

5/8/25 Vinelands Pump Station

5/8/25 Vinelands Pump Station down today for maintenance, should take all day. 11:15am Vinelands Pump back on.

April 28, 2025 News

04/28/2025 MM-003

4/28/25 Mutual Mesa headgate 003. Shut off for a repair on Kathy Jo. Should be back on later today or tomorrow. 4/28/25 MM-003 back on.