June 15, 2020 News
06/15/2020 2:00pm: A a temporary plug has been placed in the leak on the Vineland’s Pipe and the Pump has been turned on. A more permanent patch will be placed Tuesday 06/23/2020 so the Pump will be shut off Monday 06/22/2020 afternoon to drain in order to do the repair. Water will hopefully be restored later on Tuesday, possibly Wednesday.
Share this post? Facebook Twitter Linkedin