OMIDOMID
  • About
    • History
    • Service Areas
    • Water Rights
    • Responsibilities
    • Water Assessment
  • Agricultural
    • Usage Tips
    • Maintenance
    • Stormwater Discharge
    • Evapotranspiration Data
    • Soil Moisture
  • Residential
    • Usage Tips
    • Maintenance
    • Stormwater Discharge
    • Evapotranspiration Data
    • Soil Moisture
  • Providers
  • Resources
  • Contact
  • News
10/23/2023 Canal 2 headgate 90 locked
October 23, 2023 News

10/23/2023 Canal 2 headgate 90 locked

10/23/2023 Canal 2 headgate 90 is closed due to flooding. Repair needs to be made.

Read More
10
10/23/23 Vinelands Pump shut off
October 23, 2023 News

10/23/23 Vinelands Pump shut off

10/23/23 Vinelands Pump shut off due to repair by OMID.  Likely all day repair. Will keep update as information becomes available.  10/24/2023 Vinelands pump should be back on later today. 10/24/2023 11:20 AM the pump in running, repair has been […]

Read More
10
10/5/2023 Water out update
October 5, 2023 News

10/5/2023 Water out update

Water out Friday October 27th….. However…… There is a section closing early. Canal 1 headgate 145 downstream water will be out Monday October 23rd. Headgates affected 145-149.

Read More
10
9/29/2023 Canal 2 Headgate 152
September 29, 2023 News

9/29/2023 Canal 2 Headgate 152

9/29/23 Canal 2 headgate 152 locked until ditch at Sharon and Dee Vee is cleaned to stop flooding. 10/3/23 Ditches and culvert cleaned headgate unlocked.

Read More
10
9/26/23 MM-074
September 26, 2023 News

9/26/23 MM-074

9/26/23 Mutual Mesa headgate 74 is closed until Saturday 9/30/23 due to construction.  10/2/23 This headgate is still closed waiting for update. 10/4/23 headgate open until construction resumes.

Read More
10
9/8/2023 Water out
September 8, 2023 News

9/8/2023 Water out

9/8/2023 Water out – It is that time of year the big question…..When is water out? It is always scheduled for the last Friday of October. This year is October 27th. We will update if there are any changes as […]

Read More
10
8/16/2023 Canal 1 – Emergency Repair
August 16, 2023 News

8/16/2023 Canal 1 – Emergency Repair

There will be a continued low level in Canal 1 due to an emergency repair being made on Pump 4. Estimated time for repair is 72 hours. Updates will be made when information is available and when repairs are complete. […]

Read More
10
8/16/2023 Dip in the canals
August 16, 2023 News

8/16/2023 Dip in the canals

There will be a dip in the canals shortly after 8pm on 8/16/2023, we are running an efficiency test on our Vinelands Power Plant. Irrigators do what is necessary to safeguard your systems and pumps until the water levels out. […]

Read More
10
7/10/2023 Mutual Mesa ditch head gate 79
July 10, 2023 News

7/10/2023 Mutual Mesa ditch head gate 79

7/10/2023 Mutual Mesa ditch head gate 79 is closed and locked due to repair in concrete cleanout box. Will notify when back open.  7/14/23 Headgate back open.

Read More
10
6/28/2023 8pm Irrigation dip in all canals
June 21, 2023 News

6/28/2023 8pm Irrigation dip in all canals

There will be a dip in the canals shortly after 8pm on 6/28/2023, we are running a efficiency test on our Vinelands Power Plant.  Irrigators do what is necessary to safeguard your systems and pumps until the water levels out. […]

Read More
10
Page 5 of 13« First«...34567...10...»Last »

Recent Posts

  • 6/3/25 Water Loss Assessment
  • 5/8/25 Vinelands Pump Station
  • 04/28/2025 MM-003
  • 4/21/25 MM-003
  • 3/3/25 – Water in date 2025 – change.

Accessibility Statement

VISIT

668 38 Road
Palisade, CO 81526

GET DIRECTIONS

CALL

P 970 464 7885 F 970 464 5928

Email

info@omirrigation.com

® 2025 All Rights Reserved. Orchard Mesa Irrigation District